Built for the pace of UAE construction

Selected 2026 projects across Dubai, Abu Dhabi and Ras Al Khaimah — residential and infrastructure work fronts.

EMAAR BEACHFRONT / Dutch Foundation

EMAAR Beachfront — Plot B11A Locanda, Dubai

A strong reference for developer-facing ground-anchor execution in a premium Dubai project environment.

21 m
Anchor length up to
Picture11.jpg

Ground anchor drilling in active excavation

2
Anchor Layers
13 t
Anchor Capacity up to
Client / main contractor interface: Dutch Foundation – EMAAR

Radiant Bridge Tower — Al Reem Island, Abu Dhabi

Deep excavation where ground engineering interfaces directly with excavation, access, sequencing and handover.
Picture13.jpg

LIVE DEEP EXCAVATION

Multiple excavation fronts inside retained perimeter

Picture14.jpg

SITE INTERFACE

Access, sequencing and wall interface under active production

86 t • 22 m • TEMPORARY ANCHORS • 2026 •
                   SPECIALIST COORDINATION

Ground engineering is where design meets the excavation.

Wall geometry, access, equipment movement and construction 

                 sequencing all converge at the excavation face..

Picture15.jpg

RETAINED WALL INTERFACE

Working level, pile heads and active construction zone.

Picture16.jpg

EXCAVATION PROGRESSION

Large-scale excavation advancing inside the retaining system

Picture13.jpg

BODENDIP VALUE

Maintain a buildable sequence while protecting the retaining and anchoring system.

Ground engineering is where design meets the excavation.

The same anchoring discipline scales from high-density development

       sites to infrastructure packages with multiple anchor layers.

Picture23.jpg

BINGHATTI TITANIA / DUBAI

1 layer • 62.6 t • up to 22 m

Picture24.jpg

RAK UTILITIES PACKAGE

3 layers • 87 t • up to 25.5 m

European know-how. UAE delivery focus.

The prequalification presents anchor-project experience across Germany and Italy, adding multi-layer excavation knowledge to the UAE operating platform.

Picture26.jpg

BINGHATTI TITANIA / DUBAI

GERMANY

EUROVIA • Infrastructure

RAK UTILITIES PACKAGE

Picture29.jpg

ITALY

RAK UTILITIES PACKAGE

WhatsApp Image 2026-09-17 at 3.36.41 PM.jpeg

ITALY

Geani Engineering

ICOP • Special Foundations

MULTI-LAYER up to 5 layers CAPACITY up to 77 t ANCHOR LENGTH up to 26 m